The design, manufacture and installation of our lifts, covers the basic requirements of Safety & Hygiene requirements of Annex I of Directive 95/16/EC and is carried out in accordance with the rules of the ELOT EN 81-2/1999 standards.
However, in cases of building or construction deviations from the basic safety requirements of the directive, the above standards or the General Building Regulation (GOK), our company can, through the recommendation of a risk analysis study (RAS) and additional work in the facility, assess, evaluate and ultimately minimize or eliminate the above risks. This will result in the final certification of the installation in accordance with the legislation in force and ensure the safe and secure operation of the installation for installers, maintainers and inspectors.
Common Building Deviations
Common Installation Deviations
Key elements of the PMR
Request a Quote according to your needs
Interested in receiving an offer? Fill in the contact form below. Within 48 hours of your submission, a representative of our company will contact you.